The project was delivered on time and within budget. It was a group effort from all involved.HMYOI Feltham
Overview
We replaced the windows in three wings of HMYOI Feltham, two of which were fully occupied throughout. The aim was to improve safety, security and living conditions while following strict security protocols and keeping disruption to daily operations to a minimum.
We started with a full assessment of the facility and worked closely with HMPPS officials, security personnel and facility management on a plan that kept prisoners, staff and our team safe.
Our approach
Security protocols
Every member of the team was background checked and trained to work in a custodial setting. Entry and exit were strictly monitored, and tools and materials were inspected to prevent any security breach.
Phased approach
The work was split into phases, one wing at a time, so the other wings stayed fully functional and prisoners could be relocated within the facility as work progressed.
Safety and welfare
We stayed in regular contact with prison staff so prisoners were kept informed, and scheduled work around daily routines.
Quality and compliance
All materials met safety and durability requirements, with regular inspections and tests against the specification.
Results
- Better living conditions: improved insulation, ventilation and natural light.
- Stronger security: new windows with advanced security features.
- Satisfied client: HMPPS expressed satisfaction with our performance and adherence to security protocols.
The project was completed on time despite the challenges of an operational prison, and shows our capability to manage complex projects in high-security environments.