Two Part L compliant modular buildings in an 8-week programme.

Project typeModular buildings
ClientGov Facility Services Ltd
Value£369,000
LocationFeltham, London
Programme8 weeks
Project managerJames Board
RolePrincipal Contractor
SectorCustodial

Overview

Sanper Construction was engaged as Principal Contractor to deliver two fully Part L compliant modular buildings for permanent use within the prison estate at HMYOI Feltham:

  • Enhanced Gate System to streamline staff entry while maintaining strict security protocols.
  • Printz workshop to give young people real vocational skills for life beyond custody.

Both were delivered within an 8-week programme, including craning the modular units into place and full integration into the establishment’s addressable fire and alarm systems.

Enabling works

  • Reduced-level dig across the site
  • Pad foundations formed to the structural engineer’s design
  • Storm drainage rerouted
  • New electricity, water and waste services installed

Delivery

All of it was delivered inside a live, high-security environment, where access, sequencing and coordination are critical to keeping the establishment operational. We worked with Stroma Building Control, the local fire authority and the MoJ estate team to make sure everything was compliant from day one.

It’s a scalable solution that can be deployed across the estate, combining speed, compliance and secure delivery in some of the most demanding environments.

Gallery

Project gallery

Contact us

Tell us about your next project

Fill in the form and a friendly member of our team will be in touch to discuss next steps. Alternatively, give us a call or send us an email.

What do you need help with?
Phone01442 800 089
Incident hotline01442 508 780
Head office1st Floor, 2 The Waterhouse, Waterhouse Street, Hemel Hempstead, Herts, HP1 1ES
Follow usLinkedIn · Instagram · Facebook