
HMP Ranby workshop refurbishment
£416k workshop refurbishment inside a live prison for Amey.
Overview
Amey appointed Sanper Construction to refurbish several workshop areas within the workshop system at HMP Ranby, a live category C prison in Nottinghamshire.
The works included refurbishing toilet facilities for both prisoners and prison officers, a complete new lighting layout throughout the main carpentry workshop, stripping out old tiled floors and replacing them with resin flooring, and redecorating the main workshop areas.
Delivery
Every area was finished to a high standard while keeping all health and safety functions in place, giving the workshops a fresh, modern feel for the people who learn and work in them.
As the programme progressed, the team also took on additional works outside the original scope, including replacing glass partitions around the workshop perimeter, replacing barriers and overhauling the ventilation.
Results
- Better learning environment: brighter, safer workshops for vocational training.
- Flexible delivery: extra scope absorbed without disrupting the regime.
- Live establishment: delivered inside an operational prison with full security compliance.
Project gallery

Tell us about your next project
Fill in the form and a friendly member of our team will be in touch to discuss next steps. Alternatively, give us a call or send us an email.



